Blog

Sewage Break

UPDATE 8/3: E-coli water tests of Blanchard Beach have come back showing very good water conditions. Both test locations returned with only 1 MPN/100mls, which has been the normal low this season.

 

From DPW webpage:

Informational release: Sewage from Sewer Force Main Break on Flynn Avenue Contained On-Site (8/2/2017)

A sewer force main on Flynn Ave that broke late on August 1 has been repaired. Sewage from the break was contained on-site.  Information regarding the incident is being posted downstream at Blanchard Beach (Oakledge) however, there is no evidence of release to downstream surface waters.  City staff are continuing to monitor the site.  Please see the full informational release for more details and a map of the area

2 thoughts on “Sewage Break

Comments are closed.