Requests for Proposals

Requests for Proposals

From time to time, BPRW need bids and proposals for various projects and services. If we have an open bids, then you’ll find them here!

Professional Design/Build Services for Pop-Up Universally Accessible Playground

Date:  August 7, 2018

To:  Playground Contractors

This Request for Proposals invites responses from qualified and experienced professional playground design/build contractors to assist the City of Burlington Department of Parks, Recreation & Waterfront in the design, equipment and material specifications and construction of a small, Pop-Up version of the Oakledge Universally Accessible Playground. Proposals Due Friday, August 17, 2018

Complete details: 20180808 O4a Pop Up RFP

Additional Documents: 20180819 OUAP Pop Up Addendum

 

Professional Design/Engineering Services for the Rehabilitation of the Burlington Greenway – Phase 3

Date:  June 21, 2018

To:  Professional Design/Engineering Consultants

This Request for Proposals invites responses from qualified and experienced professional design and engineering consultants to assist the City of Burlington Department of Parks, Recreation & Waterfront in the rehabilitation of the Burlington Greenway, specifically in regards to design development and permitting. Questions concerning this RFP must be made via email per the schedule outlined below.  All questions submitted by 5PM on July 2, 2018  are listed and answered in Addendum 1 below.

Complete details: 20180621 BP 3 Rehab RFP Design

Addendum 1 (submitted questions with answers): 20180702 BP 3 Design RFP Addendum 1

Attachments & Supporting Documents: 

20160405 BP Phase 1b Pause Place Details

20120221 RSG – Final Report FINAL

20140722 SW_of_KingSt-land_exchange

20140728 Railway Lease Amend #3 SIGNED

20140918 BP Phase1a Final Contract Plans

20140923 BP Phase 1a Final Contract Documents

20150423 Pause Places Concepts

20151008 BP Phase 1b Pause Place Design DRAFT

2000 Open Space Protection Plan

2014 Bike Path Intersection Scoping Study

2014 Open Space Protection Plan

BPRW Parks Master Plan

Plan BTV Walk/Bike Master Plan

Plan BTV South End DRAFT

Oakledge Siting Study

Oakledge Universally Accessible Playground

BTV Bike Path Cost Estimate Summary 03-28-2018

2014 Parkway Railway Diagnostic COMBINED

20140114 Bike Path 25% Conceptual Color Graphic

 

 

SCHEDULE:

  • Issue date: June 21, 2018
  • Questions due: July 2, 2018 by 5:00 PM
  • Proposals due: July 11, 2018, by 8:00 AM

 

Inquiries/submissions to:
Jon Adams-Kollitz, Parks Project Coordinator
Burlington Parks, Recreation & Waterfront
645 Pine Street, Suite B, Burlington, VT  05401

jadamskollitz@burlingtonvt.gov
(802) 540-0363