Memorial Auditorium
Additional Information About Memorial Auditorium
Memorial Auditorium is closed and no longer used for any events.
CEDO has been tasked with:
● Create an adaptive reuse plan for Memorial Auditorium to remain a publicly-owned, public assembly space with input from stakeholders and members of the public.
● Create conceptual designs, construction pricing, and financing options for this adaptive re-use plan that reflects that feedback and provides details on the cost and possible sources of funds.
● Complete this plan so that it can be considered by the Council for a March 2019 ballot item.
For more information about the redevelopment process and plans, please visit:
burlingtonvt.gov/CEDO/Memorial-Auditorium
About the building:
Burlington Memorial Auditorium is a 2,500-seat multi-purpose arena, in Burlington, Vermont. It was built in 1927 and is operated by the Burlington Department of Parks and Recreation. As a convention center, it offers 20,000 square feet (1,900 m2) of space. The main space contains a 27-by-80-foot proscenium stage and basketball court. The building also houses 242 Main performance space, and maker space The Generator.